Labor Day Progress on the Porch

Looked forward to making some progress on this 3 day weekend.   I am happy to say that we did make some noticeable progress.  Still a little bit more before we can start sheeting the roof and put the shingles on.  Sprinkling when we stopped working.  Looks like it might rain on Wednesday, but we will not get to the roofing part until a week or two.  Need to set up the scaffolding to be able to have easier access to the roof.  Neither of us bounce anymore and doing it from a ladder, isn’t going to do it.

Saturday I did a little bit of painting to areas I knew I wouldn’t be able to reach when the roof starts going up.

Sunday, Lynn put up the roof rafters and I began putting on the clips.  There were two rafters that had a twist in them so they are not battened down just yet, but when the scaffolding is put up we can tackle that job.  It was hard on Lynn, but he managed to do them with a lot of resting in between.  I am so proud of him.  I know he doesn’t feel good, but he will not let me hire it done.  He doesn’t want to hire anyone to do what he feels he can do.

Today, I spent the morning putting up the ceiling joists while Lynn used the nail gun on them.  We stopped around1:30 as we were both tuckered out.  This is all that will get done this weekend.

Tomorrow, Lynn has a consultation with the doctor that will be placing his pace maker.  I hope all goes well at that meeting as they have been unable to regulate his heartbeat with medication.    His heartbeat is always racing 110 to 140+ beats per minute, and that is the resting heart rate.  No wonder he feels exhausted all the time.  This has been happening over an extended period of time, so he hasn’t felt well in a long long time.

Things left to do are, sheeting and roofing, building the balusters, and making gates or doors.  Then a little more painting.  After that I need to finish taking off and replacing the crown molding and fascia on the side of the house, that needs to be done before winter.  Then I will be moving inside for the winter.  I can work outside in the heat, but I hate the cold.

Now for the pictures.

Annie, palm-nailing queen.

Ready to put the scaffolding up
Ready to put the scaffolding up
A little detail of the roof rafters and ceiling joists
A little detail of the roof rafters and ceiling joists
Kinzie waiting on the roof to her dog house, eh, I mean our porch
Kinzie waiting on the roof to her dog house, eh, I mean our porch
Side view.  Not to bad for a novice carpenter.
Side view. Not to bad for a novice carpenter.

Porch Progress – Moving Slow and Steady

Lynn reluctantly spending his Sunday, working on the porch.  McKinzie staying close.
Lynn reluctantly spending his Sunday, working on the porch. McKinzie staying close.
April is supervising the operation.
April is supervising the operation.
Another detour.  Fixing a leak
Another detour. Fixing a leak
Love the smell of raw wood.
Love the smell of raw wood.
Staining the boards Rubicon Red.  2X6
Staining the boards Rubicon Red. 2X6

I get a little anxious when the weekend comes around as I want to go gun-ho on the porch.  I don’t want to do any of the other things I have to do, I just want to focus on the porch.  Maybe a little OCD?  But Lynn tempers that side of me.  He says groceries first and then we are both pooped by the time we get home.  Well, I have a plan for that…. We go to town (20 miles away) and get the groceries, come home and unpack the groceries and put them away, quickly…. Get in his truck and go to Home Depot (20 miles away) and pick up some lumber and other building materials, because tomorrow is going to be a totally “get it done” day.  We come home and we are doubly pooped.

Then he breaks the news to me, there is a pipe in the horse pasture that is leaking water and that needs to be taken care of before the porch.  Ugh.  Double ugh!!  Okay, I got to rethink this.  If we turn the well pump off Saturday night, the ground will be soft but dig-gable in the morning.  We can do that first thing as that is when the shade is in that area.

Sunday morning, up bright and early and ready to dig and get that out of the way.  I am the chief-whole-digger as I can get down and into it.  (sometimes it doesn’t pay to be healthy)  The whole is dug and the leak is found and the repair is made.  Let the glue set-up and wait a few hours and test it.  In the meantime, back to the porch.  🙂 This is me smiling.

Staining the lumber first with Architect Series Semi-Transparent Wood Stain – Rubicon Red (It is a redwood color).  This is an oil stain and I really like the color.  It is just what I wanted.  I am staining the top and sides so when it is put down, all I will have to do is some touch-up.  Besides its easier to stain standing up (wood on the saw horses) than for me to crawl around on the floor.  I get down okay, its the getting up that is a challenge.

Got out all the power tools set up for the hubby.  Skill saw; palm nailer; nail gun; compressor; hammer; wreaking bar; pry bar; and a multitude of other tools to accomplish the job.  Now to get Lynn (the hubby) out there to do some of the intricate detailed foundation of the porch work.  Some of the floor joists we are keeping as they are sound and oversized compared to the lumber of today.  Some old, and some new.

If you haven’t figured it out by now I am the energetic gopher of this project.  I get the ideas in my head and try to explain them to Lynn, and he does the magic of figuring how to make my visions come true.  He does tend to get a little frustrated at how my visions keep getting modified and more detailed.  They start out simple and evolve, while he stands there and shakes his head.

Took a break from the porch, to turn the well back on, check the leak, and refill the whole.  That job is done until the next leak.  Nothing stays fixed on a Ranch/Mini Farm.  Always something to fix.

Well I got to get back to work, there’s still daylight.

Annie, the energetic gopher  🙂

One more weekend left with the lift

Ever have one of those days? Yeah, one of those days, when you shouldn’t touch anything electronic or anything that can in any way hurt you. Ugh. I took Saturday off and rested a little and thought I would get lots done today. Well, I don’t usually get all that I envision done, but today was pretty pitiful.

I did finish painting the 42 shakes that we had cut. So I can draw a line through that on my list.  It will at least finish the one dormer. Through the winter we should get the others cut and I can start painting in the spring.   Only about 200 more.

Now for post #3. You would think after I had done two of these it would get easier. Didn’t happen. This one was a son-of-a-gun. I thought I was being really careful, but I managed to really bungle this one up. Not a total loss as I can fix it, but still not easy. The bad part is, in prying it apart I dropped the one side (the heavy side) right on my baby toe. It is broke. I don’t need a Dr. to tell me that, but there just isn’t anything that you can do, but try not to aggravate it. Needless to say it slowed me down a little.

Lynn was snapping and snarling the whole day too.  Got to love it, can’t wait until I retire and we get to enjoy each others’ company 24/7.  He did manage to get up in the lift and put some of the metal around the fascia.  We are using metal as the wood will not hold a paint finish of any kind on the front which is the weather side.    Getting ready to add more siding or work on the other dormer.  Next weekend we will try to put the other stain glass window up.  Anyway that is the plan.

I am back to work now and won’t be able to keep dogging Lynn, but hopefully he will try to get some more done before we take the lift back a week from Monday.  So next weekend with be a busy one.  Then it will be clean-up time and take all the paint and glues and all things that can’t freeze into our storage closet, so they can make it through our cold winters.

The plans for next spring are to get started earlier and maybe rent the lift for a couple of months.  The bad part about spring is we tend to get more rain and the weather isn’t quite as predictable.  We haven’t had any measurable rain for about 3 months now.  But it feels like it may be a cold winter.

I did take a few pictures and hope to have a picture of the completed dormer next weekend.  With all my grumbling today, I really love working on this dream house and can’t wait to see it completed so I can get started on a potting shed, maybe a chicken coop, paint and clean up the horse paddocks and on and on and on……

Boy my little pinky hurts and it is turning black and blue.  Looks like I will be wearing flip-flops a few more weeks.

Annie, the clumsy novice carpenter.

House wrapped before the porch was put on

House with the porch added this was the end of 2011

10-7 progress

1st finished post

Working on the posts on the front porch

Just a little more and the dormer is finished